BIM

Sustainability

Building Information Modeling

Since the firm’s inception, WM2A has focused on serving our clients and maximizing value brought to their projects. WM2A was the first A/E firm in Middle Georgia to utilize Building Information Modeling (BIM) after making the transition in October 2004. With one exception while working with an international design firm, 100% of our projects since then have been developed exclusively in BIM. Not only is WM2A adept in the use of this technology; but we have also assembled a complete architecture/interior design/ engineering team capable of delivering robust BIM models inclusive of architecture, interior design, structure, mechanical, electrical and plumbing systems.